Skip to content
PG Pulse
PG Pulse

Try searching for

Prince George power outages and rates

Live outages around Prince George, what electricity costs on each residential plan, and a quick estimate of your bill.

Source: BC Hydro outage map data. Report a data problem

Outages near Prince George

Report an outage or downed line: call 1-800-224-9376 (1-800-BCHYDRO) or dial *49376 on a cell phone.

Source: BC Hydro. Report a data problem

Outage map

Tap a marker for details. Map data © OpenStreetMap contributors.

Source: BC Hydro; OpenStreetMap. Report a data problem

Outages this week

Customers out within 150 kmCustomers out, Northern region

Loading recorded readings…

Hourly average of customers without power, recorded from BC Hydro's outage map every few minutes.

Source: BC Hydro outage map data, recorded by PG Pulse. Report a data problem

Province-wide electricity demand

Load on BC Hydro's whole system, in megawatts: all of BC Hydro's service area, not just Prince George. Daily average and the day's peak hour.

Daily averageDaily peak

Busiest hour since October 1, 2025: 10,823 MW on January 26, 2026. Hourly load on BC Hydro’s system in megawatts, summed here to daily averages and peaks. BC Hydro posts the data about once a month, so the latest weeks are not included.

Source: BC Hydro, Balancing Authority Load (hourly control area load), historical transmission data, as of September 30, 2026. Report a data problem

Residential rates

Every residential customer pays a daily basic charge plus an energy charge per kilowatt-hour. You choose the tiered or flat plan and can add time-of-day pricing to either.

Tiered rate

Tier 1 energy11.87¢ / kWh
Tier 2 energy14.08¢ / kWh
Basic charge23.44¢ / day

Tier 1 covers the first 22.1918 kWh per day of the billing period: about 675 kWh a month or 1,350 kWh every two months.

Flat rate

Energy12.70¢ / kWh
Basic charge25.00¢ / day

One price for every kilowatt-hour. BC Hydro suggests it can suit higher-use homes, such as those with electric heat.

Time-of-day option

On-peak, 4 to 9 p.m.+5¢ / kWh
Overnight, 11 p.m. to 7 a.m.−5¢ / kWh
Off-peak, 7 a.m. to 4 p.m. and 9 to 11 p.m.No change

Applied on top of either plan. Useful if you can shift EV charging or laundry overnight.

Source: BC Hydro, Residential rates (tiered rate, flat rate and time-of-day pricing pages), as of October 12, 2026. Report a data problem

Bill estimator

Time-of-day pricing

Leave both at 0 if you're not on time-of-day pricing.

For reference, a typical monthly Tier 1 threshold is 675 kWh. Your bill shows your actual use.

Tiered plan

–

Flat plan

–

Per 30-day month, before GST and any rate riders. BC Hydro's own rate estimator uses your real billing history.

Source: BC Hydro, Residential rates (tiered rate, flat rate and time-of-day pricing pages), as of October 12, 2026. Report a data problem

Where Prince George's power comes from

Prince George is on BC Hydro's integrated provincial grid. According to BC Hydro, more than 90% of its generation is hydroelectric, and over 80% of its installed capacity sits in the Peace and Columbia river basins. The Peace River dams northeast of the city are the closest major sources, including the new John Horgan Dam and Generating Station (formerly Site C), BC Hydro's third dam on the Peace, rated at 1,100 to 1,230 MW.

Locally, the City's Downtown Renewable Energy System heats about a dozen downtown buildings, including the Conference and Civic Centre, City Hall, the Canfor Leisure Pool and the Bob Harkins library branch, with hot water from a Lakeland Mills system that burns sawmill residues.

Source: BC Hydro generation system; City of Prince George, as of September 2026. Report a data problem

Sources

How these figures are gathered

Live figures are fetched from these providers and cached briefly on our server. Provisional real-time data can be revised by the source. When a source is down we say so rather than guess.

BC Hydro outage map
Live outages; we show those within 150 km of downtown
BC Hydro residential rates
Tiered, flat and time-of-day pricing
BC Hydro balancing authority load
Hourly province-wide load, posted about monthly

Add PG Pulse to your home screen

Your browser installs apps from its Share menu.

  1. Tap Share in the browser toolbar (at the bottom of the screen on iPhone, at the top on iPad).
  2. Scroll down and tap Add to Home Screen.
  3. Tap Add. PG Pulse opens from its icon like any other app.